Dates Washing Lines

Although opposed views on the use of water, washing in dates, such as fill and save it, but this difference and conflict, start to fade in favor of the need for washing and drying of dates before fill it and save it.

The washing Dates operations, restore his luster, which change under layers of dust, accumulated on its surface, while fruits and natural drying, without being affected by the water that was used in the washing, because the water user only on the outer surface of the fruits of dates, and this water evaporates during drying directly, without any increase of osmosis water, on the layers of fabric dates.

We have multiple production capacities:
250 kg per hour.
500 kg per hour
1 ton per hour.
2 tons per hour.
3 tons per hour.
4 tons per hour.
5 tons per hour.

Share on social media:

Additional content

Maamool Dates Line

An integrated production line for cutting, shaping, baking and packing maamool with dates in different

Dates Vinegar Units

The transformation of Dates juice to vinegar is a chemical process in which ethyl alcohol

Dates Molasses Units

Stages of a working group, constitute the integrated unit for production of date molasses, within